Dungeness A

Dungeness A occupies about a quarter of a 91-hectare civil nuclear site on the Kent coast in an area of Special Scientific Interest. Dungeness A stopped generating at the end of 2006 and is currently decommissioning.

Dungeness A is one of three Magnox sites which has a neighbouring EDF advanced gas-cooled reactor (AGR) site. The three neighbouring EDF AGR sites, along with four other EDF AGR sites, are due to transfer to Magnox.

On this page
Site Owner

Information is presented about wastes that existed at Dungeness A at the stock date (1 April 2025) and were forecast to arise after this date.

For background information about this site owner, please refer to the Site Information Sheets in the 2025 UK Radioactive Waste Inventory report.

The following page presents information about radioactive wastes at the specific site selected.

Information about spent fuel and nuclear materials is presented separately in the relevant 2025 Inventory report. For official figures and essential information about how the data has been produced, always refer to the UKRWI 2025 published reports.

Waste groupings

Activated metals
Activated other materials
Asbestos & other insulation materials
Concrete & rubble
Conditioned
Contaminated metals
Contaminated other materials
Desiccant & catalysts
Flocs
Fuel cladding & miscellaneous wastes
Fuel element debris
Fuels & uranium residues
Graphite
High level waste
Inorganic ion exchange materials
Miscellaneous contaminated materials
Mixed wastes
Oils & other fluids
Organic ion exchange materials
Plutonium contaminated materials
Raffinate
Sludges
Soil
Uranium & thorium contaminated material
Total
stored
waste
Total stored waste by waste type
Breakdown of total stored waste: Activated metals 137.65m³, Asbestos & other insulation materials 0.78m³, Concrete & rubble 10.02m³, Contaminated metals 300.59m³, Contaminated other materials 2.14m³, Desiccant & catalysts 5.15m³, Fuel element debris 1m³, Graphite 6.3m³, Inorganic ion exchange materials 4.88m³, Miscellaneous contaminated materials 117.21m³, Oils & other fluids 3.82m³, Sludges 73.85m³, Soil 8.61m³,
Future
arising
waste
Future arising waste by waste type
Breakdown of future arising waste: Activated metals 3944.07m³, Asbestos & other insulation materials 259.4m³, Concrete & rubble 23815.1m³, Contaminated metals 4594.47m³, Graphite 3424m³, Miscellaneous contaminated materials 866.2m³, Sludges 1.9m³, Soil 129.28m³,
Lifetime
packaged
waste
Lifetime packaged waste by waste type
Breakdown of lifetime packaged waste: Activated metals 4081.72m³, Asbestos & other insulation materials 260.18m³, Concrete & rubble 23825.1m³, Contaminated metals 4895.05m³, Contaminated other materials 2.14m³, Desiccant & catalysts 5.15m³, Fuel element debris 1m³, Graphite 3430.3m³, Inorganic ion exchange materials 4.88m³, Miscellaneous contaminated materials 983.41m³, Oils & other fluids 3.82m³, Sludges 75.75m³, Soil 137.9m³,

Waste categories

Showing results for data originating from Dungeness A.

(1) 51.5 m3 reported volume (180 m3 packaged volume; 137 packages) are stored at Bradwell.